Pre-planning is what eliminates project errors
Most fit-out failures are visible at inception if someone is looking. Here is the register we build before a single drawing is issued.
Read article
The industry tends to label us project manager or architectural consultant. We would rather be called project architect — because we are fully trained architects, and that background is what lets us resolve a problem logically rather than escalate it.
A project manager receiving a clash between a house-style detail and a local fire regulation has one move available: send it back to the design team and wait. That costs two weeks, and on a fit-out programme two weeks is the difference between opening with the campaign and opening after it.
An architect receiving the same clash can resolve it — draw the compliant alternative, test it against the house style, and put a decision in front of the maison rather than a problem.
A maison's design team owns the concept. We own everything between that concept and an open door: local compliance, landlord approval, tender, contractor selection and construction. That is the whole span, and it does not hand back.
Striving to deliver — from a concept owned in Paris to an open door in Chengdu.
Most fit-out failures are visible at inception if someone is looking. Here is the register we build before a single drawing is issued.
Read articleWhen an imported finish will not arrive in time, a substitute is only acceptable if the maison's design team can sign it off on a physical sample.
Read articleSKP, IFS, Plaza 66 and Harbour City each run their own design committee. Getting approved first cycle is a preparation problem, not a design problem.
Read articleSend us the location, the opening date and the house-style pack. We'll come back with the risks we can already see, and how we would handle each one.