Concession — Hong Kong Harbour City
01
The constraint
There was a single overnight handover between the old fit-out closing and the new one opening.
02
How we resolved it
A full pre-build and dry-run off-site meant the on-site sequence was assembly only, with services pre-terminated to a plug-in panel.
Start a Project
Tell us where you're opening
Send us the location, the opening date and the house-style pack. We'll come back with the risks we can already see, and how we would handle each one.