Flagship — Shanghai Plaza 66
01
The constraint
Cutting the slab required the tenant below to be out, and their lease ran to within three weeks of our handover.
02
How we resolved it
The stair opening was pre-engineered as a single lift-in insert so the cut, propping and installation fitted the three-week window.